A3 Salerno Reggio Calabria Motorway
Integrated multisite management of the construction site – operating range – 16 tunnel entrances dislocated 20Km. Access control and tracking to all operating areas, canteen …
ABIOGEN PHARMA SPA
With a view to improving and optimizing the safety level, has been adopted the following Active Safety solution: EGOpro Safe Move 4.0 – Warning proximity …
ARCELOR MITTAL
With a view to improving and optimizing the safety level, have been adopted the following Active Safety solutions: EGOpro Safe Move 4.0 – Warning proximity and …
Brenner Base Tunnel
Advanced Microwave Engineering was chosen by BTC to handle the active safety aspect at the Brenner Base Tunnel construction site using the integrated solution: EGOpro …
Calzedonia
EGOpro Safe Acces Control – Access control, authorizations and staff monitoring.
CAVIRO Spa
With a view to improving and optimizing the safety level, have been adopted the following Active Safety solutions: EGOpro Safe Move 4.0 – Warning proximity and …
Completion of Pavoncelli tunnel of the Sele- Calore aqueduct
Real-time control and monitoring of the number of workers in the tunnel with complete reporting of all transits, present in the area, alarms. Installation of …
DENSO Corporation
With a view to improving and optimizing the safety level, has been adopted the following Active Safety solution: EGOpro Safe Move 4.0 – Warning proximity …
DS SMITH SPA
With a view to improving and optimizing the safety level, have been adopted the following Active Safety solutions: EGOpro Safe Move 4.0 – Warning proximity and …